Skip to main content

SOP EDDS - Arrival

Stuttgart Arrival covers not only Stuttgart (EDDS) but also Karlsruhe/Baden-Baden (EDSB) and Lahr (EDTL) when Strasbourg Approach (LFST_APP) is offline, as well as the uncontrolled airfield Schwäbisch Hall (EDTY), which has instrument procedures.

Sector Splits

Stuttgart Tower shall be informed immediately about any changes in sector configuration (e.g. DSAT is openedopening or closing).

Arrival

Sector Stuttgart (STG) is the Northern arrival and the primary station. It is responsible for the Northern half of the sector. This means it covers EDTY as well.

Sector Reutlingen (REU) is the Southern sector and responsible for the Southern half. This means it covers EDSB and EDTL as well when LFST_APP is offline.

Before REU can be staffed, Stuttgart Director (DSAT) has to be online.

Director

Stuttgart Director does not have a separate sector. The handover from the respective Arrival to Director should take place at the latest on downwind. The handover altitudes between Arrival and Director have to be coordinated, e.g. 5000ft in the South and FL60/FL70 (depending on the transition level) in the North.

During a constant arrival stream on both downwinds, Arrival should hand over traffic with 16 NM or greater spacing per downwind to enable Director to create an efficient final.

Departure

Stuttgart does not have a Departure position. If both approach sectors are staffed, REU gets all departures to the South (ROTWE, SUL, KUNOD, and ABTAL), while STG gets all departures to the North (KRH, VESID, TAGIK, ETASA, OKIBA, GEBNO, and DKB).
Traffic departing via TEDGO and STG is handed off directly to Director by Tower.

EDDS_APP.pngStuttgart Arrival Sector

Airspace

Around Stuttgart there is primarily airspace D, which makes it easier to handle VFR transits. However, there is also a larger area above the control zone of Stuttgart with airspace C between 3500 ft and 5500 ft AMSL.

A detailed representation of the airspace structure is available at openflightmaps.org.

Arrival Procedures

Releases by Center

On handoff from Center to Arrival aircraft are released for turns but not for climb/descend as long as they are inside center's sector. Flights via TEKSI and REUTL are released for turns passing DODIL – LUPOL line.

STAR Assignment

Stuttgart Arrival needs to clear the desired STAR/Transition unless other arrangements have been made with Center. The following table shows all available transitions. 07/25 transitions put the aircraft onto a downwind for the respective runway, while #E/#W transitions send the aircraft directly to a base leg.

Waypoints 07 operations
25 operations
ARSUT - 25
BABEG
1E -
BADSO 07 25
DENEL
1E
-
DITBA 1E
-
GEBNO -
1W
IBIRU 07
25
KRH
07 or 1E
1W
LBU
07
25
LUPOL -
1W
NOSBU
07 or 1E
-
REUTL
07
25 or 1W
SUL -
1W
TAGIK
-
1W
TEKSI
07
25 or 1W

Out of BADSO, TEKSI, and REUTL, there are STARs that lead directly to an IAF (LBU or STG).

Approach Procedures

During approaches to runway 07, aircraft up to 5.7t MTOM may use all published approaches. For all other aircraft, the ILS approach is mandatory and exceptions are only possible in rare cases (e.g. after a runway change). However, the RNP approach may also be used by heavier aircraft if the visibility is at least 4000m and the ceiling at least 1000ft AGL.
During approaches to runway 25, all aircraft may use all published approaches.

Arrival - or Director if staffed - has toshall inform Stuttgart Tower about every aircraft not flying the approach broadcast in the ATIS.

Target Spacing

Stuttgart has only one runway. In order for Tower to have sufficient space for departures, inbounds shall be no less than 6 NM apart when touching down and no less than 12 NM during LVP. If there are only few outbounds, less spacing is also possible after coordination with Tower.

For VFR flights within the CTR, the spacing of approaches should be adjusted after coordination with Tower (depending on the intention of the VFR traffic, up to more than 10 NM).

Short Approaches

Approaches that intercept the localizer after VATER or UNSER have to be approved by Stuttgart Tower.

Visual Approaches

Non-jet aircraft up to 5.7t MTOM can be cleared for a visual approach after coordination with Tower.

07 inbounds from the North
traffic shall fly via reporting point W and the adjacent forest area and avoid built-up area
07 inbounds from the South
traffic shall avoid built-up area
25 inbounds from the North
traffic shall avoid built-up area
25 inbounds from the South
traffic shall follow highway A8 and avoid built up area
Handoff

Handoffs to Tower shall take place no later than 6 NM final, except during an SRA.

10 NM check

Approach has toshall inform Tower once an inbound reaches 10 NM final (10 NM check) under any of the following circumstances:

  • approaches with intentions other than full stop landing
  • first approach after a runway change
  • opposite landings
  • whenever requested by Tower

Departure Procedures

As far as possible, a continuous climb should be made possible and the transfer to Center should take place early and without conflict. On handoff all departures are full released for further climb and turns.

Origin COP Level Special Conditions TO

EDDS

EDTY
EDSB
EDTL

ABTAL, KUNOD 140 full release EDMM ZUG / RDG
SUL 140 LSAS
DKB, GEBNO 100 DKB
OKIBA 140 DKB
all other 140 BAD
KRH 80 max. RFL, rel. for turns PFA
Destination COP Level Special Conditions TO
EDDR BADLI 100 full release PFA

LFSB

LFGA

LIPKA 140 full release LFSB
EDSB coordination
coordination if LFST_APP online LFST_APP

Stuttgart Tower has to be informed immediately of any traffic being turned off the SID below 5000ft.

Tower SOP

Please also check the EDDS Tower, Ground, and Delivery SOPs to familiarize yourself with Tower procedures relevant for Arrival operations to enable the necessary coordination with the ground stations.

MVA

Due to high terrain around Stuttgart, special care must be taken here. The MVA for the entire sector can be found in the Topsky maps for Euroscope. Due to the MVA, it is not possible to, e.g., let approaches via TEKSI descend directly to 4000ft; instead, at least one intermediate altitude must be used.

For users of a chart service such as Navigraph, an MVA chart for EDSB and EDTL is available through the charts for LFST.

VFR Transits

VFR flights above 5500ft AMSL will fly through airspace D around Stuttgart. Between 3500ft and 5500ft AMSL the controller need to take care of airspace C! Flights through C airspace are not recommended but possible with the CVFR clearance.

Holdings

The following holdings are published around Stuttgart:

  • BADSO (MHA 5000)
  • TEKSI (MHA 5000)
  • REUTL (MHA 6000)
  • LBU (MHA 6000)
  • STG (MHA 7000)

grafik.pngholdings within Stuttgart Arrival

Possible Conflicts

  • For descending flights, the existing MVA must always be considered, especially below 5000 ft AMSL and west of the airport!
  • The potential for conflict between intersecting approaches and departures must be taken into account.
  • Even in the case of different departure routes, attention must be paid to the necessary separation of departures due to the fact that they follow the same track in some places.
  • Due to the Black Forest (elevated terrain) between EDSB/EDTL and EDDS, the MVA in this area is 6300 ft AMSL, so IFR flights must be at least at FL70 there.