Recently Updated Pages
VCCS
The usage of VCCS is discouraged. Instead, use VACS.
Tower
Tower Positions These two Tower Positions exist at München: Sector Login Station ID Fr...
Euroscope Installation
EuroScope is a very powerful software used to provide ATC in Germany on the VATSIM network. It is...
vATIS - User Guide
vATIS profiles are available for each of the vatger FIRs. Installation vATIS can be downloaded ...
Arriving in Munich
Arrival Even if your flight plan contains a STAR, your en-route clearance ends at ROKIL, LANDU...
Frequently Asked Questions
How do I register for S1 training? To be considered for training, you must add your name to the ...
Apron
Areas of Responsibility Apron The Munich Apron can be divided into three areas of responsibilit...
Tower
Stuttgart Tower is responsible for the runway and traffic within the Stuttgart CTR. Please also ...
Elemental Sectors
Bamberg - BBG // Hof - HOF Login Sector Indicator Frequency Callsign Remark ...
Tower
Tower positions In Leipzig there are the following two Tower positions: Position Station...
Ground
Leipzig Ground is responsible for push-backs from all positions as well as taxiing traffic on the...
Overview
Leipzig ATC Stations Station Station ID Login Frequency Remark ATIS PX ...
Separation on parallel runways
General Airports may have multiple parallel runways to increase capacity. In Germany, there are ...
Staffelung auf Parallelpisten
Einleitung Flughäfen können zur Erhöhung ihrer Kapazität mehrere Pisten haben, welche parallel a...
Overview
Saarbrücken is a small airport located directly at the German-French border and in 2018, it becam...
EDDP - Leipzig/Halle
General All content of this page is not for real world navigation and only for use on VATSIM! W...
7-Tectical Brevity Words
Word Meaning ABORT(ING) Cancel/action/event mission, or, I am unable to continue missi...
Not withholding a takeoff or landing clearance
This procedure is not a mandatory part of S1 training. Introduction Under certain circumstances...
Nicht Zurückhalten einer Start- bzw. Landefreigabe
Dieses Verfahren ist kein verpflichtender Bestandteil der S1-Ausbildung. Einführung Eine Start-...
Laage PAR (29.08.2026, 1600-2000z)
1. General Erwartete Pistenrichtung 27 Die Schichten im APP/PAR-Bereich können gern individue...