Skip to main content

Delivery

Berlin Delivery can be staffed as soon as there is Berlin Tower and Berlin Apron online. To open more than three stations on the ground Berlin Delivery is always required to be online.

Runway Assignment

The runway assignment is depending on the parking positions of departing aircraft. It might be necessary to deviate from this rule due to traffic. The task of Delivery is to assign the departure runways to the aircraft as efficient as possible at any time.

EDDB_Runway.png

Departure Routes

  • All SIDs are RNAV only (excl. ROKMU1P)
  • All aircraft via SUKIP 2Q and LOGDO 2Q are required an RFL (Requested Flight Level) of least FL120

vSID Plugin Commands

The following plugin commands for vSID are available at EDDB:

Command
Explanation

.vsid area eddb north

This will disable the area where all aircraft will be assigned to runway 06L/24R.

.vsid area eddb south

This will disable the area where all aircraft will be assigned to runway 06R/24L.

The service of Datalink clearances shall be provided at any time.

Airport collaborative decision-making (A-CDM)

The A-CDM process will be simulated at EDDB during (weekly) events and any other high-traffic situations. Further information here: https://dms.vatsim-germany.org/s/odw629qZk5WezPi

Invalid Routes / Old AIRAC

Invalid Route + old AIRAC installed

  • Assign old SID
  • Only applicable for flights via SOGMA, ODLUN, MAXAN, POVEL, HLZ

Invalid Route + new AIRAC installed

  • re-routing required
  • Only applicable for flights via SOGMA, ODLUN, MAXAN, POVEL, HLZ
  • Available re-routings:
    • SOGMA → SUKIP M748 SOGMA
    • HLZ → SUKIP Y206 BUREL P203 HLZ
    • POVEL → LOGDO Z20 MAG L986 POVEL
    • MAXAN → LOGDO Z20 MAG Z115 MAXAN
    • ODLUN → LOGDO Z117 ODLUN

All other invalid routes

  • Either complete re-routing or vectored / visual departure

VFR Traffic

  • VFR pilots are required to do their initial call on Berlin Delivery
  • Berlin Delivery provides pilots with information such as active runways and QNH
  • Berlin Delivery should create a F-Plan if not already done by the pilot (".am" command)
  • Coordinate every VFR aircraft with Tower (release by Tower required prior handoff to Ground)

Quicksheet

EDDB_Quicksheet 2410.png